Company organized HVAC professional technical training and exchange meeting

2006/11/07

On the afternoon of November 7, the HVAC professional technical training and exchange meeting was held in the company's training room. The meeting was presided over by Eng. Liu , the company's chief engineer, and relevant persons in charge of HVAC and all designers attended the meeting.

At the meeting, Eng. Liu introduced the company's common problems in the process of reviewing the drawings from the aspects of energy saving, calculation books, standard drawings, heating, ventilation and accident ventilation, air conditioning, fire prevention and fire protection, and civil air defense. In the follow-up design, how to avoid these problems was explained in depth.

 

After that, Eng. Liu further emphasized the common problems of designers, including: design description, outdoor general plan, air vents, accident ventilation and anti-smoke, process ventilation, heating and air conditioning, and civil air defense.